Moftinu-1001 Well Brought Safely Under Control 01/07/2018 Serinus Energy Inc. (“Serinus”, “SEN” or the “Company”) (TSX:SEN, WSE:SEN) reports that it has been successful in safely bringing the Moftinu 1001 gas well back under control. As previously released, the loss of control of the well occurred at 1:49am EET on Monday 18 December 2017, during routine operations to prepare the Moftinu 1001 well for future production. During that operation an unexpected gas release occurred and subsequently ignited. Read more…