News
Moftinu – 1008 Well Flows 4.0 MMscf/d on Test
02/23/2021
Pricing Anomaly between London and Warsaw listings
02/05/2021
Moftinu–1008 Well Spudded
01/18/2021
Interviews
Serinus Energy M1008 a good strong production well with very good economics
24/02/2021
Operational Update
23/12/2020
Increasing production, Increasing cashflow
30/11/2020
Costs down, production up and a positive outlook
23/11/2020
Accelerating economic returns with extended licence
15/10/2020